HomeOutfittingCanoe RatesBunkhousesYouth GroupsCabinsCabin RatesProperty MapFor Sale: CanoesLinksPhotosBrochureDirections/MapContact Us

Kawishiwi Lodge Main Dock
LakeOneHighWater.jpg
High waters this spring, looking out at the Lake One bay.

Kawishiwi Lodge & Lake One Outfitters
Lodge.JPG
The front office.

Kawishiwi Lodge & Lake One Outfitters
LodgeSittingArea.jpg
Public sitting area in the lodge.

Bunkhouse #2
FrankPaintingBunk.JPG
Frank is painting before the first guests arrive.

Boathouse area
SpringDucks.JPG
Spring has arrived! The ducks are back!!!

Cabin #11 residing
cabin11front.jpg
Roger putting on the screens, time to move on to the next project

Cabin #11 residing
board.jpg
Board and batting siding. The porch will be shaded.

Cabin #11 residing
side.jpg
The deck will be replaced with treated lumber.

Cabin #11 residing
11.jpg
Tearing off siding and pulling off the screens.

Cabin #11 residing
c11.jpg
Ice in the crane's hydraulics, so we moved onto other maintenence.

Cabin #19 Construction
slightlist.jpg
Lake One in the distance

Cabin #19 Construction
craneworks.jpg
The crane is fixed and it works! Thanks Bob!

Cabin #19 Construction
rogandphil.jpg
"I can't find my pencil, do you have one?"

Cabin #19 Construction
bob.jpg
Bob Pintar is fixing the broken crane.

Cabin #19 Constuction
reattchinghoses.jpg
Roger is reattaching hoses, Phil is sanding logs.

Cabin #19 Construction
toiler.jpg
Toilers of the crane. Fuzzy and Doc.

Cabin #19 Construction
whoops.jpg
Whoops!

Cabin #19 Construction
nicefit.jpg
Tight fitting saddle notches

Cabin #19 Constuction
goingup.jpg
2nd course of logs. Finally some progress

Cabin #19 construction
38log.jpg
38-Inch log, too big for the mill.

Cabin #19 Construction
biglog.jpg
21-inch paneling is being cut out of this log! 12/15/2007

Cabin #19 Construction
pines.jpg
Massive white pine saw logs ready for the mill.

Cabin #19 Construction
silllogs.jpg
Sill Logs

Cabin # 19 Construction
cuttingrouchnotch.jpg
Phil is cutting a rough notch on 12/13/2007

Cabin # 19 Construction
Cabin19construction2.jpg
Phil is dragging a log to building site.

Cabin # 19 Construction
Cabin19construction1.jpg
Phil cutting sill logs. 12/06/2007


Kawishiwi Lodge Beach Area
BeautifulEveningCanoes.jpg
We've had some beautiful evenings in May.

Kawishiwi Lodge & Lake One Outfitters
LodgeOffice.JPG
The office.

Kawishiwi Lodge & Lake One Outfitters
PublicSittingArea.jpg
Office entry way, phone, & sitting area.

Bunkhouse #2
FrankBunkhouse.JPG
Frank is getting the sprayer going & ready to paint.

Kawishiwi Lodge & Lake One Outfitter's Main Beach
LargeYouthGroup.JPG
Our first youth group of the season broke through the remaining ice.

Cabin #18
cabin18inside.jpg
Spraying polyurethane, the final step after fours years of construction

Cabin #11 residing
sideof11.jpg
The entire storage shed needed to be taken off.

Cabin #11 residing
scrap.jpg
A lot of siding and rotten wood needed to be replaced on this cabin.

Cabin #11 residing
c11side.jpg
Although it looks fine in these before pictures, needs a littleTLC.

Cabin #19 Construction
610.jpg
January 24th. -28 degrees F today. Back wall is 6'10" tall.

Cabin #19 Construction
lookinglikecabin.jpg
1/16/08: 6 feet high and getting a good log building system going

Cabin #19 Construction
view.jpg
View from the cabin

Cabin #19 Construction
pigpen.jpg
Smile for the camera, Bob.

Cabin #19 Construction
slow.jpg
Slowly getting a little higher, we will be at 5 feet high with only 3 logs

Cabin #19 Construction
sanding.jpg
Cleaning up the logs. 16 grit and big 15 amp grinder sander

Cabin #19 Construction
bullgangers.jpg
Bullgangers fixing the crane

Cabin #19 Construction
wow.jpg
A 6000 lbs log was too heavy for the crane.

Cabin #19 Construction
nearperfect.jpg
Near perfect fitting groove.

Cabin #19 Construction
cutlog.jpg
This log has been scribed and cut.

Cabin #19 Construction
sawyers.jpg
Cutting stair stringers, Mark of Northwoods Sawyers

Cabin #19 Construction
38.jpg
Trying to cut it smaller.

Cabin #19 Construction
Fuzzy.jpg
Fuzzy is replacing the crane's starter on 12/12/2007.

Cabin #19 Construction
Cabin19construction3.jpg
Crane broke down 12/10/2007.

Cabin # 19 Construction
Cabin19construction.jpg
Floor ready for logs.

Cabin #19 Construction
logs.jpg
White Pine Logs

Cabin #19 Construction
footing.jpg
Pouring Footings